Building Information Modeling Services Offer a Unique Way to Building Construction



AEC professionals have discovered a new approach to construction with 3D BIM Modeling. The implementation of Building Information Modeling services by the engineers and architects has revolutionized the construction sector. In fact, BIM service has now become the talk of the town as it is providing a unique way to building construction. The construction professionals are getting unbelievable productivity by implementing BIM. Different stages of the construction including the planning, designing, construction as well as the post construction operations are reaping the benefits of BIM.  A number of software applications like the Revit Structure, Revit Architecture and Revit MEP are catering BIM technology to develop building in a virtual world.

Let’s check out how BIM is facilitating construction sector in a unique way:

Generating Material Takeoff & Bill of Materials – Revit software generates material takeoffs & bill of materials in construction that help the building professionals to calculate project cost. 4D BIM tools are also used in this regard for estimating the total cost of the project. 


Facilitating Green Construction & Energy Analysis – Building Information Modeling has brought the concept of green construction in the AEC industry, facilitating the engineers and the architects to swiftly develop green buildings and perform energy analysis for the structural, architectural & MEP systems. Revit is equipped with energy analysis tools that let the BIM modelers to build energy analytical models for every building. This helps to develop energy simulations and allow constructional professionals to understand the building’s energy requirement. Moreover, based on the result of the energy analysis, BIM modelers are able to implement changes in the design for reducing energy consumption. 

Improving Communication & Project Execution – Furthermore, BIM is a powerful communication tool and helps in successful project execution. Parametric models developed during the pre-construction stage are quickly communicated to all the team members involved in the construction project and removes confusion and delay in work. The Revit models can easily collaborate with each other, leading to high quality error-free models.

Opt for the best Building Information Modeling Service provider and make revolutionary differences in project execution.

Sunday, December 6, 2015

Benefits of Building Information Modeling Services


While Computer Aided Drafting portrays construction elements with lines defining the structural geometry, Building Information Modeling creates structural elements as intelligent objects with parametric data, along with the physical dimensions. Every BIM model element can relate to the other objects and designs. Moreover, objects in the BIM walls could be stretched, joined and moved as and when required.  When a wall extends from the foundation to level 1 in BIM, the height of the wall gets adjusted automatically with parametric change. The doors and the windows are also aware of their relationship to the walls where they are placed and behave accordingly for making adjustment. 

Let’s check out a few benefits of using Building Information Modeling Services:

Risk Mitigation – The risk for a construction project automatically gets changed with the use of BIM.  The project participants can work with a collaborative and integrated approach. Hence, measures can be taken for mitigating an increased area of risk through insurance, contract change and policy change. A balance is struck in BIM for having collaboration between parties and managing changed risk profiles.

Design Collaboration –
Building Information Modeling changes the designing approach by facilitating collaboration between different participants at the early stage of construction. This establishes the initial framework and includes the various levels of detailing. Designers can explore different concepts, conduct value engineering and optimize their designs accordingly. Besides, BIM helps the contractors to review construction, coordinate drawings and create shop drawings. In addition the owners can optimize building maintenance and monitor the cost of project life cycle. 

IT Reliance–
BIM has placed increased reliance upon IT and with this comes the need to have safety measures like careful access right control and audit trail recording. Since BIM model is at the core of project, technical support facilities like bandwidth limits and compatibility issues are considered to a great extent. 

BIM is catering to the designers, owners and constructors by enabling collaboration among them in a way that the construction industry has never known before. Opt for the best Building Information Modeling Service provider and speed up your construction project in a streamlined way. 

Tuesday, December 1, 2015

Why 3D Modeling is Vital for Construction Sector?


3D drafting services have brought about improvement and efficiency in the construction sector.  A good number of organizations have opted for 3D modeling to improve on the building design, creation and marketing. 3D model helps to present an idea to the potential clients and to other members of the company in a clear way. Moreover, changes can be made in the 3D model quickly for incorporating new ideas and suggestions from clients and company members. Now, you may ask how the marketing efforts of the company are improved in 3D? The answer is simply by presenting the building model in an animated way to the clients for showcasing its features and functions. Furthermore, the computerized info helps to automate the production machinery of the company.

Let’s now check out why 3D modeling is imperative to construction industry?

Wide Sharing Capability - 3d models can be easily uploaded on a website and thus can be shared widely with people through internet, overcoming geographical barriers.

Graphical Surface Representation – A graphical representation of a surface can be obtained in 3D, which is often used in maps. This digital elevation or terrain model helps in making surface analysis.  

Prototype Designing – 3D CAD modeling creates prototype of a building. Consequently, it helps the 3D modelers to manipulate the building model without redrawing different views.

3d modeling has become a blessing for the builders and the architects. They can see how the construction project or the building appears on the computer without having to lay a brick. Moreover, this eliminates the need for making costly alterations in the middle of the project. As a result, huge time and money are saved. Opt for one of the best providers of 3D Drafting services and 3D BIM modeling solutions for your building construction and deliver the project with utmost accuracy to clients.  

Wednesday, November 25, 2015

3D BIM Modeling Facilitating Onsite Accuracy & Efficiency


Seamless use of 3D BIM modeling through the delivery process is aiding many avant-garde projects. Consequently, the construction professionals set out to maximize the efficiency offered by BIM and removed the need for printed plans, sections and elevations. BIM has introduced an entirely different way of working and the professionals are using the digital model throughout the design, logistics and construction. Now, let’s check out how 3D BIM Modeling is facilitating onsite accuracy and efficiency?


Visualizing Construction Process - The professionals make use of construction planning and simulation software for developing the program schedule. This helps to visualize the construction process, highlighting the opportunities for efficiency and makes it easier to spot where work can take place simultaneously in multiple areas to prevent multiple contractors working at the same area. In this way, the scheduling error is detected much ahead of time and ensures that no item or action is overlooked. Subsequently, schedule clashes don’t occur and the activities are carried out in the right sequence.


Eliminating Waste in Construction - In 3d BIM Modeling, the construction professionals extract material quantities from the project model to ensure the placement of accurate orders, thus eliminating waste. Linking these quantities with financial information of the database provides crystal clear clarity to the project cost. Many construction professionals also seek to link quantity and cost functions with embodied carbon data and its own life-cycle costing tools. 



Removing the Scope for Human Error – 3d BIM Modeling eliminates the scope of human error and helps to save time, as the total station can be received from the BIM model, in place of manual coordination. There is paperless task and so the entire process of construction gets streamlined.


3D BIM Modeling facilitates quality assurance in construction projects. Photos and typed information can be linked to the model along with metadata like time, data and GPS. Besides, the information recorded on site can be pushed back into the model. In addition, site data can be used for creating an accurate as-built model for weekly progress meeting. The models also help to store records in a coherent manner. So why don’t you opt for 3D BIM Modeling services? Implement 3D BIM Modeling for construction project and maintain onsite accuracy and efficiency.

Thursday, November 19, 2015

Take Productivity to the Next Level Combining IPD with BIM



Want to take the productivity of your construction project to the next level? Why don’t you think of combining IPD with BIM? IPD or the Integrated Project Delivery method helps to cooperate and collaborate between the project stakeholders like the building owners, engineers, architects, contractors and fabricators from the beginning of the construction work. If this is used with Building Information Modeling Services, it would enhance project productivity through different stages of construction.  The industry experts are thinking of enhancing project productivity by combining IPD with BIM as this collaboration would help to improve project planning, designing and construction and would result in on-time project delivery. Now, what’s the specialty of implementing IPD? This collaborative approach makes sure that all the parties involved with the project are equally responsible for the success and failure of the project. As a result of which the risks and rewards are also shared equally among them. The thought of sharing the risks and rewards motivate the stakeholders to give their best performance through all the stages of design and construction. 



Let’s check out why IPD should be combined with BIM to improve the building construction productivity:



Effective Project Management – It’s of no doubt that Integrated Project Delivery Approach alone could not deliver a successful project. It must be complimented with Building Information Modeling for effective project management. 



Seamless Construction & On-time Delivery – Both BIM and IPD address various aspects of the construction process. However, when it comes to on-time project delivery and seamless construction, both these methods become equally important to the building stakeholders. It’s not possible for IPD alone to lead to the success of construction. BIM tools are also essential to develop a perfect design that can enhance the productivity of AEC professionals during the final construction stage.



Accurate Information Sharing - Remember that successful collaboration among the stakeholders can only be possible, if accurate information is shared among them and the parametric models, developed through BIM tools like Revit help to share apt information. Those models could be easily transferred to the building owners, architects, engineers, contractors and other parties involved in construction.


Go for this collaborative approach of IPD and Building Information Modeling and enhance the productivity of building professionals.

Monday, November 9, 2015

BIM Fever Gripping the Construction Sector


Nowadays, almost everybody is talking about implementing Building Information Modeling in the construction sector. In fact, 3/4th of the construction industry is said to have been engulfed by BIM fever as per the recent report of the National BIM Survey in Manchester. This survey showed that the BIM implementation awareness has grown steadily from 58% in 2010 to 95% in 2014. But, what are the reasons for the much hype about this Architectural BIM Services? Let’s check out the main causes for the most sought after construction technology in this blog:

Competitive Advantages - 
Most of the AEC professionals rely on BIM as it provides them competitive advantages. The survey report reveals 70% construction firms to have already implemented BIM solution and fulfilled their demands. 4D BIM solutions perform scheduling and phasing in an efficient manner, whereas the 5D services offer cost efficacy by estimating the costs of materials, quantities, resources and take-offs. BIM also acts as a time-saver as it helps in timely construction of the project.

Great Opportunities –
BIM provides great opportunities to the Architects as well as the construction companies. The architects can build highly effective 3D, 4D and 5D designs of a building digitally and help the engineers understand the complete attributes of the building, physically and functionally during pre-construction stages.

Most of the construction companies are employing BIM services for cost-efficacy and completing construction within the specified time. Even if, BIM solution has an initial set up cost, itshould not be ignored for getting the long-run benefits in the construction industry. The companies should not shy away from implementing BIM, rather should treat this as an investment to keep pace with technological growth. It would be better, if the organizations can get rid of all skepticism about BIM Modeling Services and move toward fast BIM implementation. The confidence on Architectural BIM services has rose from 35% in 2013 to 46% in 2014. NBS Survey reveals 54% construction firms to have utilized BIM Modeling solutions on building projects and 93% respondents to implement BIM by 2016. So, get trained on BIM and adopt this technology for cost efficiency, increased delivery speed and enchanced profitability. 

Monday, September 14, 2015

Fire Safety BIM – Unique, Simple, and Accurate


Building information modeling (BIM) has taken the fire protection (FP) industry to a newer level of accuracy and efficiency. Historically, fire safety measures have always played important roles in the development of civilizations. By examining the designs of ancient buildings, one can realize the amount of scientific thought that had been spared for making them safe and secure. These measures were deemed necessary not only to protect the inhabitants from accidental fires but also any sabotage or conspiracies by enemy agents. With the passage of time, FP measures ceased to be an exclusive issue with the rich and powerful because governments across the world began to take active interest in ensuring them on a large scale for the general public. Such a conscious decision was taken with the aim of ensuring minimal loss of life and property. Consequently, a great deal of investment was made in researching fire safety measures. BIM has taken all these measures to a higher level of technological innovations.

The advent of BIM has enabled proper coordination among FP professionals and others involved in the construction industry (architects, structural engineers, civil engineers, HVAC installers, and plumbing specialists). This is a marked departure to earlier practices when Fire Safety engineers worked almost by themselves or with minimal coordination with others. Presently, sprinkler designers use customized programs for developing 3D models of FP systems that are capable of auto-preparation of hydraulic calculations, system components’ print lists, and inserting hangers and bracing on drawings on the basis of dimensions and pipe sizes. These tools are extremely useful for the designer but cannot be used or understood by the other stakeholders as they are limited to the specific system applications rather than shared with the building model. Likewise, innovations in fire alarm drafting technology allow designers to build systems that can automatically assign network addresses to devices, calculate voltage drops, perform battery calculations, and prepare riser diagrams. Such tools bring in a great deal of automation and reduce the risks of human errors, but remain underutilized as they are system-specific.

BIM, on the other hand, allows inter- and intra-system knowledge transfer. Thus, the designer’s ideas and concepts get transported to the other stakeholders in the same way as he or she intends it to be. This means that BIM allows the visualization of the project model in a collective manner. This actually translates to the fact that everyone is aware not only of the locations of fire alarms, sprinklers, and smoke detectors but also of their exact dimensions, operating conditions, and other such technicalities. This helps, in the longer run, in proper maintenance of all such systems and gadgets. Also, it enables maintenance staff to respond quickly in cases of repairs and emergencies as the model allows visualization of the entire construction from all possible angles. Thus, when fires are caused by short circuits or other events, not only do the fire dousing operations get activated immediately, but the rescue teams also have enough time to plan their operations as the source, the magnitude, and the direction of the movement of the fire can be pinpointed exactly. This goes a long way in saving life and property because of enhanced emergency response systems.

Another important advantage of using BIM in the science of FP is that it allows easy upgrading of technology and replacement of defective parts. This is possible because the data is easily retrievable from the BIM of a construction and comprehensible. Maintenance staff need not waste time in investigating or researching about the existing technology because the information is already available to them. This saves a great deal of time as they can take on-spot decisions without being apprehensive of fatal errors.

The third importance of using BIM in FP is its ability to resolve clashes with other trades. Thus, during the designing process, it is easy to identify whether the sprinkler system or the fire alarm circuit is passing through an HVAC duct or a water pipe or any other such utility systems. Also, it makes it easier to connect the sprinkler system to the plumbing system so that there is a steady availability of water and the sprinklers are functional. Similarly, BIM helps to connect the fire dousing systems like fire hose cabinets (FHC) to be connected to the plumbing system. These may not be used frequently but have to be maintained regularly to ensure usability during emergency situations. For very large buildings with large floor areas and numerous levels or floors, BIM comes in handy to find out their exact coordinates.

All these advantages of using BIM are gradually altering the approach toward building design and planning. More and more general contractors and subcontractors are willing to come out of the traditional building construction methods and reap the benefits of BIM because of the cost-effectiveness ensured by the technology through its exact materials estimation and time scale. In conclusion, it can be safely said that BIM has completely revolutionized the approach towards building designs and constructions.


Pinnacle-Revit Symbiosis: JULPHAR-KSA PHARMACEUTICAL PLANT, JEDDAH



The Pinnacle Story
‘Slow and steady wins the race’ is an adage that has been virtually trashed by Pinnacle’s rapid and phenomenal progress within a span of two decades. Pinnacle has emerged as a world-leader and above par achiever from its humble beginnings. The Pinnacle ship has been steered by the dynamic Bimal Patwari, who has always stuck to the basics. This is what defines Pinnacle – simplicity. Now Pinnacle is the top-most BIM solutions provider in the world and the preferred choice of some of the biggest names in the global construction industry. Operating out of five locations across the globe (Houston, Dubai, Calolziocorte, Kolkata, and Durgapur) Pinnacle has developed a steady clientele in 30 countries and successfully executed 4000 projects.
The Julphar project was the most challenging project ever undertaken by Pinnacle and the challenge was extenuated by the brand reputation and the immensity of the stakes involved. Pinnacle did not shy away from the challenge because of its trust in Autodesk – the company that provides the technological backup to ‘the BIMmer’. And for this project Autodesk’s Revit 2011 was what exactly Pinnacle required.
The major challenge involved in the Julphar project was related to the fact that Pinnacle had to take care of the entire process from design development to CD set or shop drawing creation. The client had only provided scanned copies of hand-drawn sketches and from them we developed the 2D shop-drawings which totaled up to 60 sheets. Coupled with this were the continuous and exhaustive revisions that were made by the structural engineer from time to time and these went up to as high as seven.
Revit 2011
Revit 2011 helped Pinnacle to create the BOQ (Bill of Quantity), coordination, and shop drawings in 3D, that were later converted into 2D and submitted to M + W Group of Singapore.  This helped the partners from Singapore to clinch the deal at the tendering stage because Pinnacle had made it possible to do so with its highly accurate solution that proved to be the most cost-effective. Also, the icing on the cake was the value-added services of Pinnacle. These services not only strengthened the bond between Pinnacle and the contractor but also enabled the complex project to be completed with the greatest ease. Pinnacle’s value-added services included providing the hanging equipment elevation, duct/pipe/conduct elevation, and the input elevation for diffusers/grille/lights that were not mounted to the ceiling.
However, as Revit was a fairly new software that had been launched recently and since Pinnacle was using this for the first time, there were some initial difficulties that were encountered. For example, Revit could not generate the bill of quantity from the conventional format nor could it provide the individual lengths or areas of the pipe and duct fittings (Revit could only calculate the total area of the duct and the total length of the pipe). Thus, calculating the pipe length for the different areas like the pump room, building area, and the underground area was difficult. A similar difficulty was faced while calculating the total area of the damper. Also, neither did Revit possess sufficient tools for calculating the shuttering area that was also an important requirement from the client’s perspective nor was it possible to calculate the stair volumes.
These problems were solved primarily with the help of the add-ins that were developed by Autodesk or through the individual initiatives of our engineers who used some other features of Revit 2011. Again, the software made it easy for us to maintain the layer standard that was fixed by the client. Another smart feature of Revit 2011 was that it allowed auto updation of the cover sheet along with the 3D model. So, Revit 2011 not only provided us with accurate figures but also spared us the hassles of manual calculations and resultant delays.

In the end, Julphar was a job well done, showcasing Pinnacle’s skill and Autodesk’s technological innovation.

Tuesday, September 1, 2015



Meet you at #535!
San Francisco, CA. (Aug25, 2015) – Like the apple is to ‘gravity’, so is BIM to construction. Yes, you heard it right! Here is your opportunity to be a little BIMological with us at the ‘Electrical Fair’ of NECA!
Standing out in a crowd
Right from the inception, we at Pinnacle Infotech, have overreached all pinnacles and carved out a niche for ourselves. Our excellence has been matched by only a few and we are proud of our standards. Awards and recognitions from both the industry and the government have trickled in steadily in recognition of our excellence. We are proud of the fact that NASSCOM, the leading IT trade association, has named us among the Top IT innovators on four occasions (2006, 2007, 2008, and 20011).
The successful completion of more than 4000 BIM projects in 30 countries is proof of our strong presence in the global playing fields and enriched us with a deep sense of understanding of the international building codes and procedures. Our global delivery system enables us to be in constant contact with our clients, transcending geographical limits.
Goodbye 2D
The introduction of 3D BIM to the electrical construction industry, has almost bid adieu to the days of 2D charts and drawings. Our imagination and enterprise convert your dreams to reality.
Team Pinnacle specializes in the virtual construction of 3D BIM electrical models of conduits, cable trays, lighting fixtures, fire alarms, and other electrical equipment that are based on the contract drawings, manufacturers’ specifications, and clients’ standards. We can create detailed electrical room models to show the electrical connections among the panels and transformers. We are known for providing Value Engineering and Design Validations to clients to help them improve their efficiency and save on costs.
Virtual constructions of projects with BIM enable independent Reviews of the Construction Plans and Specifications. This helps to identify discrepancies in drawings and addresses all constructability issues at the preconstruction stage itself. During the constructability review, our BIM team generates a series of RFI’s to help identify the following types of constructability and operational issues:
  • Missing information / documents
  • Input inconsistencies
  • Conflicting data
  • Operation clearance issues
  • Maintenance access
The BIM model is updated based on responses of RFI’s and so the status of all RFI’s is maintained in a log and follow-up is done to resolve them at the preconstruction stage. This helps to eliminate work stoppages and unnecessary reworks during construction. 
Imagination meets Productivity
When it comes to Pinnacle everything starts BIMologically! Our intelligent solutions are actually the digital prototypes of our creativity and aid us to simulate your imaginative faculties about the wonders that can be created by this modern and new technology. Fortunately, since you are reading this article, you are in the cradle of the BIM revolution.
So, why wait???
Make your imagination happen!!!
Be with us at the NECA event in San Francisco at Booth #535.
Where we believe in shaping your Vision!!
To add Pinnacle Infotech in your Expo Plan for the NECA event, you can click on our NECA ebooth widget present at the right corner of our event page link  http://www.pinnaclecad.com/files/neca-2015.php
To find out more, visit www.pinnaclecad.com

Monday, August 24, 2015

The Old Order Changeth Yielding Place to the New: Think Big; Think BIM!



Since time immemorial, civilization has progressed steadily by following a single principle—the principle of change. This change has, at times been rather sudden, forceful, and violent and at other times, it has worked slowly and steadily so that in the end, the tentacles of the change proved to be too strong to be ignored and avoided. Thus, while the extinction of the dinosaurs and other prehistoric life forms came as a sudden jolt that paved the way for humans to rule the roost on earth, the slow and steady change brought about by the spirit of science helped us to shed the ignorance of a life that was clouded by religious indoctrination. Although religion has not deserted us completely nor have we been rid of myth and superstition, yet it has ceased to exert the same asphyxiating influence on human beings as it did centuries ago.

Building Information Modeling, or BIM in short, has had a similar impact in the world of architecture and construction. Slowly and steadily it has emerged as an important tool that has replaced the tried and tested, but unusually long-lived, 2D design methodology.  When Douglas C. Englebart gave us an uncanny vision of the future architect in his paper Augmenting Human Intellect in 1962, he was little aware of the impact it would ultimately have.
Although it took almost 20 years for BIM to actually take shape and another 20 years to have a world-wide impact, it did prove true Englebart’s prognostication. This technology has revolutionized the construction industry like never before so much so that we can say from its perspective, “Think big; think BIM!”


References
http://www.architectureresearchlab.com/arl/2011/08/21/bim-history

BIM For Digital Prefabrication

Fabrication takes time and assembling of distinct components depends on a myriad of complex factors. BIM helps in varied design and construc...