Why is BIM Important for Pre-construction site logistics?
Logistics is
one of the most important stages of any AEC venture. Like when a fabricator is
transporting the precast concrete from the plant to the site, the construction
team needs to plan a lot of things ahead. Like when the concrete will be
delivered a crane will be needed to hoist the precast concrete and need to
place it in the right place. So only to put a precast
concrete in place, the general
contractor needs to oversee the transportation of material which is precast
panels, hoisting cranes and a crew to hoist these. Now getting all these three
together at the same place is what logistic is responsible for performing.
Efficient
logistics management is crucial to enhance productivity and efficiency that
have a positive influence on time and cost. For example, good logistics
management make sure the workforce is able to carry out the required activity
without delay.
Having the
project stages planning ahead with all arrangement of materials and tools are
made are key aspects of good logistics management. Because of the complexity
involves with logistic management dedicated application software can be used to
create models visualize, analyze and optimize logistics.
Why is Pre-construction site logistics crucial?
BIM
methodologies can be utilized to keep construction program on-schedule to save
cost and for reducing wastage. Other advantages of BIM models when it comes to pre-construction
site logistics.
• Enhanced productivity due to the reduction
of wastage.
• Proper logistical planning on site ensures
materials to be sorted
• Prefabrication improves efficiency and
reduces the chances of potential damage
• Fabrication can make sites to be kept safe
and clean
How to use BIM for Pre-construction site
logistics
BIM experts
create a thorough 4D
sequence of all trades, which helps to plan comprehensive construction
activities for a coordinated construction process. BIM dependency can help to
avoid any discrepancy and issues on site. As BIM is the best and the most used
digital construction technology, building contractors are relying on it for better
site planning and virtual logistics. BIM
for Pre-construction site logistics makes all the information available to
execute even the most complex projects in the best manner.
Software
like Autodesk Navisworks and Revit used to create models with views from
different angles and selections to start the sequencing process. A sequence can
be validated by classifying a primary model and applying higher levels of
simulations.
Why BIM is better than conventional ways of
project management
The
conventional ways don’t always give a clear picture of why varied construction
activities are linked in a sequence. With a 4D model, however, every on-site
activity can be understood clearly and can be seen what is happening when and
how.