Pinnacle offered BIM 4D Phasing Service at Abu Dhabi International Airport

Image
Abu DhabiInternational Airport is an international airport located in Abu Dhabi. It’s one of the fastest growing airports with more than 30 airlines offering services to over 120 destinations. Abu Dhabi airport is the second largest in the UAE serving as much as 20 million people in 2014, the number has only increased since then. A major expansion happened in 2011 and Pinnacle contributed to the progress of the airport. Pinnacle’s experts were responsible to create a bid presentation model. We focused on both interior and exterior architectural and structural elements along with MEP items were taken care of in the presentation. An AVI presentation of 4D phasing was delivered to clients. Details about BIM Service Provided To This Project BIM Start Date: August 2011 BIM End Date: December 2011 Project Area: 700,000 Sq. M.   Team Size: 25 Engineers Client: Larsen & Toubro Ltd Pinnacle’s Value addition Pinnacle has earned the client’s appreciatio...

Pinnacle Offered 4D BIM Service for OIA South Terminal Project

OIA South terminal project was renovation of an already existing construction. The remodeling of the South terminal complex and connected taxiway encompassed almost 300 acres. The purpose of constructing the airside terminal is to expand the capacity for both international and domestic flights. The airside terminal needed to have at least 16 to 24 gates. Details of the project Trades covered: Architecture LOD: 400 BIM Start Date: March 2016 BIM End Date: April 2016 BIM Software Used: Revit & 3Ds MAX Project Area: 500,000 Sq ft Pinnacle’s scope of work •     4D Flythrough for OIA South Terminal •     Further improvement of the exterior model •     4D construction phasing •     60-90 second fly over (around exterior only) In many ways, our team of BIM engineers provided numerous crucial development in the project by designing the most accurate 3D & 4D BIM model. The challenges we...