Green Field Airport: Another Jewel in Pinnacle’s Crown


Pinnacle has worked on numerous big scale projects. Pinnacle’s participation has made these big scale projects successful by delivering accurate and flawless 3D/4D/5D BIM modeling assistance. Reliable Engineering Company, Larsen & Turbo was responsible for the designing and development of this construction. L&T was our client who opted for the third party expertise and hire us to deliver flawless, accurate stimulated models for runways, terminal and for other ultra-modern annexes. 

Details about the project
    Total cost: US $ 107 million
    India’s Longest Runway: 4.43-km runway for Airbus A-380 Maximum Boarding Bridges 78
    Check-in Counters: 168
    Terminal stretches almost 3km
    Biggest Fire alarm system: 50,000 interface point
    Largest Cooling system: 20,000TR Chillers for HVAC
    BIM Start Date: October 2007
    BIM End Date: May 2010



Special features of this project
    This marvel of modern architecture has been developed in one of the busiest tier-one cities of India. The newly developed terminal 3 is planned to handle more than 37 million passengers on a daily basis.
    The terminal would have more than 130 check-in counters and 70 emigration counters. 
    This airport is equipped with a hi-tech system which enables landing within the visibility of 50 meters.

Scope of work
The modernizing and renovation of the airport was quite a humongous job to be done. The entire BIM for terminal 3 was designed by us. The expert team of BIM engineers at Pinnacle designed the entire BIM for passenger terminal building and domestic and international PIER were generated.

We delivered the following BIM solutions
    The sight-line report for Air traffic control was also created.
    Columns along with Arrival and Mezzanine level concrete structure was also designed
    Simulated structures of Raft Foundation was also designed
    We created an entire set of simulations for the interior structure model.
    Our expert team also detect clash between structure and HVAC and between structure and SA Duct.
    Additionally, we offer Quantity estimation and construction phasing as per the turnaround time.

Comments

  1. GREAT WORK NICE WORK GREAT INFO AND ALSO VISIT THE LINK BELOW
    Documentation Services in India

    ReplyDelete
  2. THANKS FOR SHARING SUCH A AMAZING CONTENT
    GREAT PIECE OF WORK!!!
    REALLY APPRECIATE YOUR WORK!!!
    autocad drafting services

    ReplyDelete
  3. THANKS FOR SHARING SUCH A AMAZING WORK
    NICE WORK
    Shop Drawings Preparation in USA

    ReplyDelete
  4. Thanks for sharing. Please do visit the link below.
    Bim consulting services

    ReplyDelete

Post a Comment

Popular posts from this blog

Top Three BIM Services for General Contractors

How BIM Brings LEED V4 Certified Sustainable Design (Green Building) to Construction?

Visit NECA 2019 and Learn About the Latest Advancement of Electrical Construction Industry